← Back to projects
CLIFTON HILL
London
The property was stripped out and restructured to deliver an additional 2,500 sq/ft basement. This included a gym and massage area, as well as a flexible area for family living. Partial Demolition & Refurbishment of Existing House (structural and Fit Out) including formation of Basement, with Spiral metal staircase feature, resin poured Floor Finishes to Basement.